Why do solar proposals vary?expand_more
Energy loads, shade, roof or ground conditions, equipment, electrical capacity, interconnection, ownership and warranties differ.
Does ordinary solar operate during an outage?expand_more
Grid-tied solar normally shuts down unless approved backup equipment isolates and serves selected loads.
Who confirms permits for Marcola?expand_more
Assign permit and inspection responsibility for the exact property through Lane County and responsible trade authorities.
When is a service upgrade needed?expand_more
A licensed electrical review and load calculation should determine capacity and utility requirements.
How are production estimates compared?expand_more
Compare weather, shade, orientation, degradation and equipment-loss assumptions for the same project boundary.
Who handles utility interconnection?expand_more
Name the party responsible for the application, responses, meter requirements and permission to operate.
How should substitutions be handled?expand_more
Require written comparison of model, compatibility, production, warranty, price and schedule before installation.
What belongs at closeout?expand_more
Keep permits, inspections, utility authorization, equipment, labels, shutdown instructions, monitoring, tests and warranties.