Can new flooring cover the old floor?expand_more
Sometimes, if height, attachment, flatness, moisture and product instructions support it. Document the retained layer.
Who tests moisture?expand_more
Assign the test method, locations, limits and response to a named party before installation.
Is subfloor repair included?expand_more
Only if the scope states boundaries or unit rates. Separate structural repair from surface preparation.
What material details belong in the bid?expand_more
Manufacturer, line, color, grade, dimensions, installation system, trim, waste and extra stock.
Who moves appliances?expand_more
The contract should assign disconnection, movement, storage, reconnection and testing.
Do flooring projects require permits?expand_more
Finish work differs from structural or trade alterations. Confirm the exact scope with Springfield.
How should hidden damage change price?expand_more
Require photographs, measured quantities and written approval using an agreed rate or proposal.
What belongs in closeout?expand_more
Resolved punch list, care and warranty records, test documentation, extra stock and completed reinstallations.