Does solar always require a panel upgrade?expand_more
No. Existing condition, capacity and the full load analysis determine needed service work.
Can a battery back up the whole home?expand_more
Some systems can, but define loads, operating priorities and equipment before selecting scope.
Who handles electrical permits?expand_more
Assign the appropriately licensed contractor and permit responsibilities in writing.
Is an incentive guaranteed?expand_more
No. Confirm current eligibility, equipment, contractor and documentation requirements.
Should roof condition be checked first?expand_more
Yes. Document covering, structure, access and future replacement risk before array design.
What affects EV charging scope?expand_more
Vehicle needs, charging rate, service capacity, route, parking and future use.
What should commissioning test?expand_more
Test installed generation, charging, transfer, controls, monitoring and protective functions.
What belongs at closeout?expand_more
Keep permits, utility records, equipment list, photographs, tests, monitoring access and warranties.